What to Track, and What to Ignore
A new time tracker invites completeness. Thirty projects, a task for every activity, tags for client, phase, priority and mood. It feels rigorous for about a fortnight, and then the logging cost outgrows whatever the data was worth and the whole thing quietly stops.
The useful question is not “what could I track?” but “what decision will this number change?” Categories that do not change a decision are pure overhead.
Start from the questions
Most people want answers to a small number of things:
- What did this project actually cost? Needs: time attributed to a project, and a billable flag.
- Am I spending my week the way I intended? Needs: four or five broad categories, nothing finer.
- Which work is quietly eating the month? Needs: enough separation between client work, internal work and admin to see the ratio.
- How long does this kind of task usually take? Needs: a consistent task name applied across many instances.
Four questions, and none of them requires a thirty-entry taxonomy. Design your categories backwards from the questions and you will land on something small.
The rule of thumb
Projects should match how you get paid or how you report. One per client engagement, one per internal initiative. If two things always appear on the same invoice or the same status update, they are one project.
Tasks should match the kinds of work you want to compare. “Development”, “review”, “meetings”, “support”. You want enough instances of each to see a pattern — a task you use twice a year tells you nothing.
Tags are for the slice you did not anticipate. Whether a piece of work was planned or unplanned, which client it belonged to, which release it fed. Add one when you have a question, not in advance.
What to ignore
Sub-five-minute activities. Logging a two-minute email costs more attention than the entry is worth, and the total is noise against a forty-hour week. Let short interruptions fall inside whatever block you are in, or create one “small stuff” entry and stop worrying about it.
Anything you will never act on. Tracking whether a task was “medium” or “high” priority feels responsible. If you have never once changed a plan because of that field, delete it.
Detail you cannot sustain on a bad day. The real test of a category scheme is a Thursday when three things broke. Whatever you can still log honestly at 5pm on that Thursday is the scheme you actually have; everything beyond it is fiction you will write in later, badly.
Other people’s minutes, unless you must. If you manage a team, the temptation to track at a fine grain is strong and the return is poor. Project-level totals answer nearly every management question. Task-level detail mostly produces defensiveness.
The one thing worth over-tracking
Non-billable work. It is the category people are least motivated to log, because it does not turn into money, and it is the category that explains where the money went. An agency that discovers 30% of its capacity goes to internal admin and unbilled support has found something actionable. An agency that only tracks billable hours has a tidy log and a mysterious cash flow.
Prune quarterly
Every three months, open your project and task lists and delete anything with almost no time against it. An unused category is not harmless: it appears in every dropdown, it slows down every entry, and it makes the list feel like a chore. Archiving five stale projects makes the remaining ones easier to pick correctly, which improves the data.
The target is a scheme you can operate without thinking. If choosing where an entry goes takes more than a second, the scheme is too big.
Timecrack keeps projects and tasks deliberately simple for this reason — see the features overview for how they fit together, or try the structure yourself on the demo instance.
Need Professional Help?
Get custom development, managed hosting, data migration, and technical support — directly from the creators of Timecrack.
Explore Premium